GB Remanufacturing
AD - HEUI Injector - 99-03 Ford/Navistar 7.3 Liter 722-504
Refundable Core Charge: $150
More InformationPart # 722-505
These Split-Shot (Prime) injectors include the HEUI™ fuel system that features an integrated fuel pump within the fuel injector assembly. This highly engineered fuel system provides performance and efficiency and requires an extensive understanding of the unit’s operating principles during the remanufacturing process.
Year | Application # | Navistar P/N # (Reference Only) | Ford P/N # (Reference Only) |
1994-1998 | Ford F-Series (49 states) | 1822801C98
(1) 1822801C99 (1) 1821836C3 (2) 1822800C95 (3) 1816187C3 (4) |
F8IZ9E527DRM F4TZ9VE527AARM |
1994-1996 | Ford F-Series (California) | ||
1994-1996 | Ford E-Series (All) | ||
1994-1996 | Navistar
T444E Up to Engine S/N 4601094 |
||
1999 | Ford F-Series
(49 states) vehicle built before 12/7/98 |
1824583C97
(1) 1825125C1 (2) 1824582C94 (3) 1822803C1 (4) |
F8IZ9E527BRM |
1997-1999 | Ford F-Series
(California) vehicle built before 12/7/98 |
||
1997-1999 | Navistar T444E
S/N 460195 to 843889 |
||
1999-2002 | Ford F-Series
& E-Series (All) vehicle built after 12/7/98 |
1831487C92
(1) 1831487C93 (1) 1831489C1 (2) 1831551C1 (3) 1831550C1 (4) |
F8IZ9E527CRM |
1999-2002 | Navistar
T444E Engine S/N 843990 & Up |
||
1999-2002 | Ford F-Series S/N 661496 through 896812 | N/A | F8IZ9E527EARM XC3ZE527AARM Long Lead |
Ford E-Series S/N 661974 through 896812 |
WARNING : This product can expose you to chemicals including arsenic, which is known to the State of California to cause cancer. For more information, go to www.P65Warnings.ca.gov